GIZAN REGION DAM
الخدمة : Infrastructure
الوظيفة : محطات تحلية المياه
العميل : Ministry of Agriculture and Water
Phase "A"
Preparation of feasibility study to dispose of the sediments existing in the reservoir and control shear quantity entering the reservoir annually. The work also includes Topographic and Hydrological Surveys of 1000 sq.km of Catchment Areas. Setting up hydrometer station, inspection of instruments embedded in the body of the dam, soil classification and Geotechnical Investigation.
Phase "B"
Detail Design and Preparation of Tender Documents of Sediment traps and Nursery.
COMPLETION DATE:
1987
SERVICES :
• Feasibility Study
• Final Design
Salient Features
Existing WTP : 18
New WTP : 81
Wells locations : 552