HARAMAIN HIGH SPEED RAIL (HHR) PROJECT, PHASE-1
الخدمة : Transportation Engineering
الوظيفة : الطرق السريعة والجسور
العميل : Ministry of Transportation Saudi Railways Organization
Phase-2 includes all the remaining infrastructure works not included in Phase 1, such as, but not limited to: the Operation Control Center, High and Low Voltage Power Supply, Catenary, Track, Interlocking and Main Line Signaling, Telecommunications, Automatic Fare Collection, Platform Screen Doors, Work bases; Workshops, Small Depots; other Technical Buildings, etc.
COST: (SAR)
35.25 Billion.
COMPLETION DATE: 
2015
SERVICES :
•       
Preparation of Tender Documents
Salient Features:
•       
450  High Speed km railway line.
 
      
     
             
                                 
                                 
                                     
                                     
                                                 
                                                 
                                                 
                                                 
                                                 
                                                 
                                                