DESIGN OF COMMUNITY ROADS – JUBAIL
الخدمة : Transportation Engineering
الوظيفة : الطرق السريعة والجسور
العميل : Royal Commission for Jubail
Design and engineering services support for a network of roads and provision of access to the freeways for Jubail community area. The works includes the diamond interchanges, split diamond interchanges, partial cloverleaf interchanges and pre-stressed concrete bridges. Moreover, the project pertains landscaping of the right of ways, street lighting, signing and signalling, roads maintenance and bus studies. The detailed design includes the traffic survey, geotechnical investigations, geometric design of roads, concrete bridges for grade separated intersections. Preparation of cost estimates and tenders under various design packages.
COST: (SAR) 1.1 Billion
COMPLETION DATE:
1986
SERVICES :
•
Site Engineering
•
Site Development and
Design
•
Road network design
•
Interchanges and bridges design
•
Drainage culverts design
•
Support during Construction
Salient Features:
Length of Road
network 50 Km
Split diamond
Interchanges 2
Diamond
Interchanges 4
Partial cloverleaf
Interchanges 1
Pres-stressed concrete
bridges 8