SAUDI LANDBRIDGE PROJECT (EAST-WEST RAILWAY LINE)
Service : Transportation Engineering
Discipline : Highways and Bridges
Client : SNCFI (France) Saudi Railways Organization (SA)
The alignment design of the east-west
Landbridge route a distance of approximately 950km from Riyadh to Jeddah and
includes realignment of the existing line together with a new line between
Dammam and Jubail. Includes Surveys, geotechnical, hydrological and
COST: (SAR) 36 Billion.
COMPLETION DATE:
-
SERVICES :
• Preparation of
preliminary alignment
• Cost estimate
of civil work
• Liaison between
the client and the International Firm
• Preparation of
reports
Salient Features:
Construction of a 950
km new line between Riyadh and Jeddah.
Construction of a c. 115 km new line between Dammam and Jubail