HAWIYAH NGL RECOVERY PROGRAM
Service : Oil and Gas
Discipline : Design and Project Management
Client : Saudi Aramco
The NGL Recovery Plant will maximize ethane recovery80-95% to
meet 930 btu/scf HHV specification for residue sales gas using turbo
expander technology.
The design includes:
-
Inlet metering
-
CO removal from NGL
-
Inlet gas hydration and mercury removal
-
Turbo expander equipment
-
Residue gas compression
-
NGL surge and storage,
metering and
-
shipping pumps
-
- Tie-ins to the boundary line of the NGL
-
recovery facilities
-
Upgrading / expansion of existing utilities and
- offsites facilities
COMPLETION DATE:
2007