AL-HUNAYY WATER TRANSMISSION PROJECT
Service : Infrastructure
Discipline : Desalination Plants
Client : Ministry of Agriculture and Water
Involves Design of Water Transmission
System to transfer of Treated Water from Al Hunayy wells to
Riyadh City.
The above comprises of a forwarding pumping station, three booster pumping stations, 65 well pumps, storage reservoir and a state-of-the-art telemetric control system.
COST: (SAR) 1,500,000,000
COMPLETION DATE:
1993
SERVICES :
• Water Transmission Line Design
• Pump Station Design
• Storage Tank Design
• Mechanical Engineering Services
• Electrical Engineering Services
Salient Features
Capacity : 360,000 Cum / day
Pipe line length : 170 km
Twin Pipe Dia : 1200 mm
Main Pump Station : 1
Booster Pump Stations : 3