HARAMAIN HIGH SPEED RAIL (HHR) PROJECT, PHASE-1
Service : Transportation Engineering
Discipline : Highways and Bridges
Client : Ministry of Transportation Saudi Railways Organization
Phase-2 includes all the remaining infrastructure works not included in Phase 1, such as, but not limited to: the Operation Control Center, High and Low Voltage Power Supply, Catenary, Track, Interlocking and Main Line Signaling, Telecommunications, Automatic Fare Collection, Platform Screen Doors, Work bases; Workshops, Small Depots; other Technical Buildings, etc.
COST: (SAR)
35.25 Billion.
COMPLETION DATE:
2015
SERVICES :
•
Preparation of Tender Documents
Salient Features:
•
450 High Speed km railway line.