SANITARY NETWORK DESIGN OF RIYADH CITY
الخدمة : Infrastructure
الوظيفة : محطات تحلية المياه
العميل : Riyadh Water and Sewerage Authority
Phase I: Design of sewerage system for Rawdah, Baghlaf, Naseem, Mursalat and Umm-al-Hammam.
• Area = 11537 Ha.
• Length of Lines = 1057 Km
Phase II: Construction management and supervision of sewerage installations including house connections,
• Area = 1100 Ha.
• Length of Lines = 160 Km
• Dia = 200 - 800mm
• Manholes = 2946
• House Connections 9500
Phase III: Construction management of laying of pipeline and house connections.
• Area = 570 Ha.
• Length of Lines = 98 Km
• Manholes = 1740
• House Connections 5940
• Demolition/ Filling of Septic Tanks = 4200
Phase IV: Construction management of laying of pipeline and house connections.
• Area = 720 Ha.
• Length of Lines = 78 Km
• House Connections = 5215
LOCATION :
Riyadh - KSA
COST: (SAR) 1,430,000,000
COMPLETION DATE:
Phase I : 1986
Phase II: 1986
Phase III:1987
SERVICES :
• Design of Sewerage System
• Construction Management
• Supervision of Sewerage Installations